Home > Watch-Tower > Bangalore Metro Rail Route

Bangalore Metro Rail Route

Original/Initial Route: East-West (18.1 km) & North-South (14.9 km) Corridors, Total: 33 km

East-West Corridor North-South Corridor
Elevated
  • Along old Madras Road up to junction of 100-ft Road, Indiranagar
  • 100ft road to BM Sri Circle
  • BM Sri Circle along CMH Road up to Aanjanappa Circle
  • Aanjanappa Circle (Ulsoor) along SV Road up to Trinity Circle
  • Trinity Circle to Mayo Hall
Underground
  • Mayo Hall-Cubbon Park along Bal Bhavan Road
  • Dr Ambedkar Road (from MS Building up to KR Circle) along District Office Road-Post Office Road
  • Majestic Circle near SBM-KG Road
  • KARTC bus stand-below railway station
  • Magadi road up to Leprosy Hospital
Elevated
  • From Leprosy Hospital along Magadi Road up to Tollgate (junction of Chord Road)
  • Along Chord Road up to Mysore Road
  • Along Mysore Road up to Nayandahalli
Elevated
  • From Yeshwanthpur along Tumkur Road up to Soap Factory
  • From Soap Factory Circle along West of Chord Road up to Modi Hospital Road Junction
  • Along Mahakavi Kuvempu Road up to Railway Bridge at Malleswaram;Runs parallel to railway track up to Swastik
Underground
  • From Swastik (Opposite Stadium) along Platform Road
  • KSRTC bus stand-below East-West Corridor
  • Below Balepet-Nagarthpet-Arcot Srinivasachar street
  • Below Vanivilas Hospital and become elevated at Bangalore Medical College
Elevated
  • KR Road (Near BMC) up to Vanivilas Circle
  • Along VV Road up to Lalbagh West Gate
  • From West Gate along RV Road up to dead-end of RV Road

 

To improve the reach of Metro in Bangalore, Karnataka Urban Infrastructure Development Finance Corporation (KUIDFC) proposes to extend metro rail services to the outskirts of Bangalore. The Comprehensive Transport and Traffic Plan (CTTP) is awaiting final approval for the extension of metro corridors beyond the currently-planned terminals (as shown in the table above). This means an additional 8 km is planned to the existing 33 km stretch.

The Byappanahalli terminal wil extend till Whitefield, those at Yeshwanthpur and Mysore Road will reach up to Yelahanka and the proposed Peripheral Ring Road (PRR) near Kanakapura Road respectively. There is a plan to extend the RV Road metro terminal up to the PRR. 

Basically the route will be exended upto,

  • Hesarghatta Cross on the East (5.6 km,cost of Rs 900 crore)
  • Banashankar II Stage on the West (2.5 km)
  • K R Puram on the South
  • Nayandahalli on the North 

 In view of the route extension the ridership will increase from the proposed 1 million to 1.15 million "per day".  Earlier Phase 1 was planned over 33 km across two corridors (N-S of 14.9 kms and E-W of 18.1 kms) with 32 stops. Now, it will be 36 stops with the extended rail length of 8 km. Each additional kilometre will cost BMRC Rs 150 crore, apart from land acquisition costs.

The Reach One of Phase I between MG Road and Byappanahalli will be commissioned by March 2010 and the entire Phase I will be opened by December 2011.

The revised route is as follows,

 East-West Corridor

  •  Heasarghatta Cross
  • Yeshwantpur
  • Mahalakshmi Layout
  • Rajajinagar
  • Malleswaram
  • Majestic
  • Chickpet
  • City Market
  • KR Road
  • South End Circle
  • Jayanagar
  • RV Road Terminal
  • Banashankari II Stage

North-South Corridor

  • KR Puram
  • Byappanahalli
  • CMH Road
  • Ulsoor
  • Trinity Circle
  • MG Road
  • KSCA Stadium
  • Vidhana Soudha
  • Centrla College
  • Majestic
  • City Railway Station
  • Magadi Road
  • Tollgage
  • Hosahalli
  • Vijayanagar
  • Deepanjalinagar
  • Mysore Road Terminal
  • Nayandahalli
 

SandalWood

          dot   Ramesh to remake Kuselan
          dot   Jayamala releases Kempa audio
          dot   Srinivas to direct Kashinath's son
          dot   Arjun is all set to release on August 15th
          dot   Sona makes Kannada debut
          dot   Gallery: Movies | Actors | Actresses